The paper studies the implementation of a new transformer station in a network designed to take over some of the existing consumers, to provide the necessary energy
for a number of new consumers and a reserve for future new connections to the electricity grid. By creating a fuzzy model, a number of rules have been created to highlight the power consumtion regimes, manifested at the level of the transformer station. Also, the possibility of optimizing and taking over from existing clients was created so that a balance and an optimization can be created regarding the disposition of the consumers on each station. |
|